GMT Exploration Company LLC
Pryor Federal-State #4H
Drilling Operations
12/03/2012
-
12/06/2012
6:00 6:00 0.00
12-3-12 MONDAY; START MIRU MCVAY. RIG #4 FROM KERMIT TEXAS, 100% EQPT ON LOCATION
6:00 6:00 0.00
12-4-12 TUESDAY; SET OUT EQPT AND RU ALL ASSOCIATED SERVICES FOR OPERATION TRUCKS
6:00 6:00 0.00
RELEASED
@
1400 PM 12-4-12
6:00
20:00
14.00
12-5-12 WEDNESDAY; BUILD CONDUCTOR, FLOWLINE, FLOOD PITS,
RU
CLOSE LOOP
20:00 22:00
2.00 Spud
the
Pryor Federal-State Com
4H @
20:00
hrs
MST.
on
12-5-12.
R/D
171/2" surface section 1/98'
to 133'
22:00
23:30
1.50 Lost returns
@
133'. Build and pump LCM pills and regain circulation.
23:30
0:00
0.50 R/D
17 1/2"
surface section f/133'
to 145'.
0:00
2:00 2.00 Lost returns
@
145'. Build and spot LCM pills and regain circulation
2:00 3:00 1.00
R/D
17 1/2"
surface section f/145'
to
170'.
3:00 6:00 3.00
Build and pump LCM pills
to
regain circulation.
Notified Christy with BLM @ 0830 AM
on
12-4-12
of
intent
to
spud
12/07/2012
6:00
7:00 1.00
Mix and pump LCM pills.
7:00 7:30 0.50 R/D
17 1/2"
surface section f/170'
to
202'.
No
returns.
7:30 8:00
0.50 Set kelly back and POOH
to
spot cement plug.
8:00 19:30
11.50 Wait on Schlumberger cementers
to
arrive on location.
19:30
20:30
1.00 ran 1
std
DP
to
95'. PJSM and
R/U
cementers. Test lines
to
1500 psi. Pumped
50
bbls.
Of
water ahead
20:30 20:30
0.00
followed
by
250 sks.
( 59 )
bbls.
Of
surry class
c
with 2% CaCL2
@
14.8 ppg. Yield
of 1.36
and 6.86 water
20:30 20:30
0.00
gal/sk. With
5
lbs.
of
koal
seal.
Pull 1
std DP
20:30
1:00
4.50 WOC
4
hrs. and fill conductor pipe with
43
bbls. Of water. Water was falling back slowly.
1:00
3:00 2.00 Wait on second load
of
cement
to
arrive. Ran 1
std
DP
to 95'
3:00
3:30 0.50
R/U cementers and pump
75 sx
(18 bbls)
Of
class
c
cement with 2% CL2
@
14.8 ppg. Yield
of 1.36
and
6.86
3:30 3:30 0.00 water gal/sk. With 2% CaCI2
& 5
lbs.
of
koal
seal.
Got returns.
R/D
cementers and POOH one stand
of
DP.
3:30 3:30 0.00
Had 12'
of
cement on bottom
of
DP.
3:30 6:00 2.50
WOC
4
hrs. water level was staying steady
in
conductor 24' down.
Informed
the
BLM office
in
Carlsbad, New Mexico
of
our plan. Talked
to
Chris and
Ed
and they didn't
have
a
problem with
our
plan.
Diesel used 660 gals. Fuel
on
hand 7057 gals.