DCS RDT-366SS Instalační příručka Strana 6

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 30
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 5
PLANNING THE INSTALLATION
5
RECOMMENDED INSTALLATION INSTRUCTION
Install components in the following order:
A) Vent Hood
B) Backguard System
C) Range
1) Locate and level range according to range installation instructions.
2) Measure distance from floor to top of island trim on range adding 1/8for backguard clearance.
3) Transfer this measurement to the wall. This will mark the bottom of your backguard.
4) From this line measure 28 up wall to mark top of 30 backguard. This is the minimum height
that the bottom of your vent hood can be installed.
6) Follow vent hood manufacturers installation instructions to install vent hood.
7) Follow backguard installation instructions to install backguard.
8) Connect gas and electric connections and slide range into position.
STEP 1:
MOVING AND PLACING THE RANGE
The ranges have shipping weights varying from
380lbs. to 600lbs. After removal of packing material,
it is recommended that the door(s), grates, front kick
panel, and drip pan (below knobs) be removed to
facilitate handling. This will reduce the weight for
ease of handling.
UNPACKING AND HANDLING
Kick Panel
Fig. 1
Zobrazit stránku 5
1 2 3 4 5 6 7 8 9 10 11 ... 29 30

Komentáře k této Příručce

Žádné komentáře